Cargill Corporate Headquarters
EVS redesigned the entrance road and internal roadways to improve geometrics for posted speed limits and sight lines. Important project goals were to preserve the forested areas and adhere to a consistent design theme.In addition to the roadway work, EVS designed a subsurface drainage system to control flooding of the Cargill Lakehouse Tunnel. EVS designed a small pumping station to remove water from around the foundation.
